River
Loading frame…
surface velocity, slow → fast (arrows ×4)
surveyed cross-sections
gauge point (red ring = low confidence)
Ready
Pick a river, optionally damage the clip, and run the agent.
Discharge
—
m³/s at surveyed sections
Vs reference
—
current meter / ADCP
Surface velocity
—
median, OpenCV tracking
Camera motion
—
before → after repair
Agent trace
perception → decision → action 0.0 s- Each tool call the agent makes appears here, with the OpenCV measurement that drove it.